Before Uncle goes, he helps us to fibreglass in our cockpit floor again and re install the helm to make Nandji ready to sail once again. Our Sailboat Refit is nearly complete and this is the second to last job that needs to be completed before we can go back in the water.
We have lived 9 long months without a fridge, yep NO FRIDGE! Our toilet has always been something that we are not happy with as it draws lots of power and is generally not a nice item to fix, therefore, we get a new one!
We install the fridge and remove the old head to install the new shiny throne. Playing the game of thrones on a boat is something new. This toilet is a prize winning piece of engineering though and can be installed basically anywhere! For more information about the toilet or our new fridge head over to the Our Gear page.
|